|
Professional
certificate
|
Life
Fellow of the Institution of Engineers, Bangladesh (FIEB).
|
|
Professional
experience
|
21 years of experience since passing B.Sc.
Engineering
|
|
|
During PhD study supervise
M. Sc. students and assisted the regular Master of Engineering
students of the Land and Water Development core in Hydraulic
Engineering Department at IHE, Delft, The Netherlands
|
|
Period
|
From
1-3-07 to till date (under lien from BWDB)
|
|
Office
|
Estuary
Development Program, project of BWDB, MoWR
|
|
Position
|
Project
Manager, (Survey & Study Support Unit)
|
|
Assignments
|
Bathymetric
surveys for Meghna Estuary of Bangladesh along with micro-level
surveys for the support and preparation of viable investment
projects and for update the existing database.
Hyro-surveys
(marine) of the entire coastal area for the understanding of the
hyro-dynamics & the morphological process of the Bay of Bengal.
Investigation
and design of potential cross dam
Investigation
and implementation of potential erosion control & accelerated
land accretion schemes.
|
|
Period
|
From
15-12-2005 to 28-2-2007
|
|
Office
|
Directorate of
Planning III, Bangladesh Water Development Board (BWDB)
|
|
Position
|
Executive Engineer
|
|
Assignments
|
In
charge of the environmental division of the directorate
Very
much involved with the planning, monitoring evaluation activities of
various water sector project and worked directly under the
supervision of director and the chief planning (especially with the
policy related matters).
Closely
related with the Dutch aided IPSWAM (Integrated Planning for
Sustainable Water Management) project.
|
|
Period
|
From
01-01-2003 to 14-12-2005 (under lien from BWDB)
|
|
Office
|
PDO-ICZMP
Project, Water Resources Planning Organization (WARPO), Ministry of
Water Resources (MoWR)
|
|
Position
|
Senior
National expert (Coastal & Water Engineer; Project or Programme
Development Facilitator)
|
|
Assignments
|
Involved in
Dutch and DFID aided Integrated Coastal Zone Management Plan (ICZMP)
Project for:
- Formulation
of the coastal zone policy
- Formulation
of the coastal development strategy
- Development
of priority investment programme
- Activities
related to enhancing livelihood capacity
- Creation
of enabling institutional environment for coastal development
- Development
of integrated knowledge base and knowledge management (coastal
data base)
- Vulnerability
analysis, risk assessment, coping mechanism and disaster
management
- Analyzing
and assessment of the environmental, hydrological and
morphological situation in the coastal zone
- Coastal
water management related activities etc. (designing
and implementing programmes, projects and activities in the
field of coastal protection, coastal polders and land
accretion/erosion)
- Reviewing the existing
policies, previous studies (MES I & II, CERP etc.),
hydrographic survey and planned programmes and activities
related to Coastal Zone management
- Reviewing the existing
Mathematical Modelling and GIS activities relevant for the
coastal zone of Bangladesh (particularly in relation to cyclone
surge, erosion, accretion, climate change, drainage and flooding
etc.)
- Coordinating with the
relevant implementing agencies (through Focal Points (FP) of
ICZMP) on coastal survey and mapping activities and formulation
of specific project (Concept Notes) and programmes for coastal
zone development
- Land zoning activities
|
|
Period
|
From
14-01-91 to 31-12-2002
|
|
Office
|
Directorate
of Planning-III (Formerly Directorate of Planning Schemes-IV, EIP),
BWDB, Dhaka
|
|
Position
|
Sub-Divisional Engineer
|
|
Assignments
|
Involved in
Dutch aided Early Implementation Projects (EIP) & Integrated
Planning for Sustainable Water Management (IPSWAM) project for:
|
|
|
·
Planning
of physical infrastructures for Flood Control, Drainage and
Irrigation Schemes;
|
|
|
·
Development
of Decision Support Systems to analyze the FCD/I schemes and for
multi-criteria analysis;
|
|
|
·
Preparation
of feasibility study report for the Polder 39/2D with a new approach
of planning with the help of FASSI and EXPERT CHOICE computer model;
|
|
|
·
Worked as a active member of
the system planning cell (center of planning expertise in the BWDB)
and arranged presentations to disseminate the newly developed
planning concept;
|
|
|
·
Water
Management Study for the Polder 43/2A considering participatory
water management for sustainable water development;
|
|
|
·
Operation
and Maintenance (O&M) planning study with participatory approach
for sustainable water development for Polder 22 & Polder 43/2E
under IPSWAM project;
|
|
|
·
Operation
and Maintenance (assessment) study of several Flood Control,
Drainage and Irrigation (FCD/I) schemes;
|
|
|
·
Preparing
feasibility study reports for various projects on Flood Control,
Drainage and Irrigation (FCD/I) schemes;
|
|
|
·
Design of
embankment and drainage channels of the FCD/I schemes;
|
|
|
·
Preparing
Project Concept Paper (PCP);
|
|
|
·
Preparing
Project Pro-forma (PP);
|
|
|
·
Reviewing
design of different hydraulic structures & embankments;
|
|
|
·
Scrutiny
of Annual Development Programme (ADP) and Revised Annual Development
Programme (RADP);
|
|
|
·
Monitoring
progress and quality of the on-going implementation works of EIP
schemes all over Bangladesh by field visits;
|
|
|
·
Monitoring
Embankment Maintenance Group (EMG) works and Landless Contracting
Societies (LCS) works.
|
|
Period
|
From
11-09-1988 to 13- 01- 1991
|
|
Office
|
Boarder
River Cell (Presently abolished)
|
|
Position
|
Assistant Engineer
|
|
Assignments
|
Preliminary
assessments and planning processes of three mini barrage
construction work (at B-baria, Moulabi bazar and Dinajpur district),
data collection, field visits and Project Concept Paper (PCP)
formulation.
|
|
Period
|
Since
passing B. Sc. Engineering to 31-8-1988
|
|
Office
|
Private
service (Drilltech, a group of Property Development Ltd.)
|
|
Position
|
Field
Engineer/ Project Engineer
|
|
Assignments
|
- Soil
investigation in different parts of Bangladesh;
- Different
types of foundation works;
- Drilling
of cast-in-situ pilling and its casting;
- Construction
and driving of pre-cast pilling;
- Implementation
of sand pilling.
|
|
Major
publications
|
|
- “An
Integrated Approach for the Improvement of Flood Control and
Drainage Schemes in the Coastal Belt of Bangladesh." A PhD
thesis published in 2002.
|
- “Flood
Control and Drainage Improvement Possibilities in the Bhanda
Beel Area, Surma–Kushiyara Basin, North East Region,
Bangladesh.” An M. Sc. thesis published in 1995.
- “New
Approach to Water Management in the Polders of Bangladesh”,
Workshops on Agricultural Base Development in Tidal Swamp and
Estuaries and Environmental Consideration, International
Commission on Irrigation and Drainage (ICID) and Korean National
Committee of ICID, Seoul, Korea, 2001.
|
- “Climate
Change and Water Resources Management in Bangladesh”,
Published in a book named “ Climate Change and Water Resources
in South Asia” A. A Balkema Publishers, London, UK, 2005
|
- “Water Management
Objectives and their Realization in Coastal Lowland Areas in
Bangladesh and Indonesia”, International Workshop on
Sustainable Development of Tidal Areas, International Commission
on Irrigation and Drainage (ICID) and Canadian National
Committee of ICID, Montreal, Canada, 2002.
|
- “Dhaka
– A Flood Prone Mega City in The Ganges-Brahmaputra-Meghna (GBM)
Delta”, Prepared for the Urbanized Flood-prone Delta Project,
Department of Spatial Planning & Water Management, RIZA
Institute for Inland Water Management and Waste Water Treatment,
Directorate-General of Public Works and Water Management and
Ministry of Transport, Public Works and Water Management, the
Netherlands- 2005.
- “Flood
Protection Measures and Impacts of Climate Change in the Coastal
Zone of Bangladesh”, International Symposium on Floods in Coastal Cities under Climate
Change Conditions, Asian Institute of Technology Conference
Center (AITCC), a
Research Project sponsored by the Asia-Pacific Network for
Global Change Research (APN), Bangkok, Thailand, 2005.
|
- One
of the contributors of the book named “Where Land Meets the
Sea”- a UPL publication in 2004, Dhaka.
|
|
Training
and workshop (Local/
Foreign)
|
|
|
Attend
workshops on International
Symposium on Floods in Coastal Cities under Climate Change
Conditions, Asian Institute of Technology Conference Center (AITCC),
a
Research Project sponsored by the Asia-Pacific Network for Global
Change Research (APN), Bangkok, Thailand, 2005.
|
|
·
Attend
workshops on Agricultural Base Development in Tidal Swamp and
Estuaries and Environmental Consideration (one week), International
Commission on Irrigation and Drainage (ICID) and Korean National
Committee of ICID in 2001, Seoul, Korea
|
|
|
·
Attend 8th
ICID International Drainage Workshop (5 days) in 2000, New Delhi,
India.
|
|
|
·
Attend workshop on People’s
Participation in Water Sector (2 days) in 1997, Lessons Learned from
Experience, Bangladesh Centre for Advanced studies.
|
|
|
·
Attend workshop on Water
Management Planning Process (2 days) at Dhaka in 1996, North-east
Regional Project (FAP-6), Canadian International Development Agency.
|
|
|
·
Attend course on Management
Planning Training (6 days) at Dhaka in 1996, Centre for Management
Development.
|
|
|
·
Attend workshop on Zendar and
Development (2 days) at Dhaka in 1996, Canadian International
Development Agency.
|
|
|
·
Attended workshop on Landless
Contracting Societies (2 days in 1993) in Bangladesh Academy of
Rural Development (BARD), Comilla, Directorate of Planning Schemes
IV (EIP), Bangladesh Water Development Board, Dhaka.
|
|
|
·
Training Course on Hydraulic
Modelling (DUFLOW) conducted by Early Implementation Projects (EIP)
for 17 days in 1992 at Motijheel, Dhaka.
|
|
|
·
Induction Training on
Policies, Procedures, Rules & Regulations, Accounts and
Engineering Activities of BWDB (office and field level) from Kaptai
Engineering Academy, Kaptai and all over Bangladesh for 7 months in
1990.
·
Attend and organized huge
number of seminars, workshops and training programmes during
consultancy service period and continuing
|
|
Computer
skill
|
|
|
·
Received
several computer training during the service in BWDB and study
periods at IHE, the Netherlands.
|
|
|
·
Very good
command of Microsoft Office Software (e.g. MS Word, Excel, Power
Point, Photo Editor, etc.).
|
|
|
·
Worked
with different Software (related to the work) during several studies
in BWDB as well as during the thesis (M.Sc and PhD) studies at IHE
in the Netherlands.
|
|
|
·
Good
experience in Hydrodynamic mathematical modeling and GIS modeling.
|
|
|
·
Development
of decision support system and its application in FCD/I schemes.
|
|
Languages
|
-
English: reading, writing and
speaking – excellent
-
Bengali: reading, writing and
speaking – excellent
-
Hindi:
speaking – good
|
|
Country
visited
|
The Netherlands,
England, France, Germany, Belgium, Luxembourg, Singapore, Malaysia,
Korea, Thailand and India.
|